FleetFrankfurt FRA-1Site Overview
Load
31.4 MW
PUE
1.28
Carbon
312 g
Executive Dashboard

Frankfurt FRA-1 — Operational Overview

Live telemetry · 4,820 sensors streaming · last refresh 2s ago

Site Optimization Scenarios

· 3 scenarios · click to focus · checkbox to compare
ScenarioPrimarySecondaryTotal SavingsEnergy CostLatencyCarbonRenewableSLAReliabilityGridOpt. ScoreTradeoffAI Conf.Status
Baseline Scenario
Live system · no optimization
$84K
0.0%
38ms
0.0%
312g
0.0%
47%
0.0pp
99.62%
0.0pp
100
0.0%
+0%
0.0%
5.0
8.0
100%Live
Carbon-first APAC
Weight 40%
carbon emissionsrenewable usage+$4.0K/d
$80K
4.8%
38ms
12.2%
213g
31.6%
67%
19.6pp
99.62%
0.0pp
99
1.0%
+6%
6.2%
7.7
8.0
80%Active
Latency-protective AI
Weight 50%
latencyAI compute eff.+$0.0K/d
$84K
4.5%
31ms
18.0%
315g
1.0%
47%
0.0pp
99.73%
0.1pp
106
5.5%
+2%
1.5%
5.8
8.0
86%Saved

Scenario Strategies

· 3 scenarios
Open Site Strategies
ScenarioTarget functionsRelevant strategiesCountSitesSystemsDetails
Baseline Scenario
Live system
No optimization · pre-system state
Historical baseline — no strategies running
0
Carbon-first APAC
Weight 40%
PMinimize carbon emissionsSMaximize renewable usage · 40%
5139
Latency-protective AI
Weight 50%
PMinimize latencySMaximize AI compute eff. · 50%
5135
Selected
Carbon-first A…
Optimization scenario
Energy Savings
$4.0K
/day
▼ 4.8%
Sustainability
32%
CO₂↓
▲ 19.6pp
Performance
38ms
▲ 12.2%
Risk Impact
Higher
▼ 1.0%
Opt. Score
7.7/10
optimization score
Total Facility Load
31.4
MW
of 48 MW capacity▲ 0.4 MW
IT Load
23.1
MW
73.5% of total
Cooling Load
6.8
MW
21.6% of total
PUE (live)
1.28
Target 1.20▼ 0.03
Carbon Intensity
312
g/kWh
EU grid avg 298
Renewables
47%
Solar + wind on grid
Energy Cost Today
$84.2K
Forecast $112K by EOD
Peak Demand Risk
Medium
Peak window 17–20
Available Headroom
16.6
MW
34.6% reserve
SLA Risk
Low
0 active SLA breaches
Optimization Savings
$12.5K
/day
6 active actions▲ 18%
GPU Cluster Power
3.84
MW
92% util · 2,140 GPUs

Facility Load & Forecast

Live IT, cooling, total load — next-hour predicted band

Energy Mix (24h kWh by subsystem)

Total Cost
$2.6K
  • IT Servers18,420
  • GPU AI Compute12,840
  • Cooling6,780
  • Storage2,240
  • UPS / Losses1,180
  • Lighting / Aux420

Electricity Price & Carbon (next 24h)

Top Optimization Actions

AI-prioritized · approve to execute

  • Discharge BESS-1 at 17:00–19:00 peak window
    OPT-201 · peak-shaving
    +$4,180/d
    9,200 kWh · 2,870 kg CO₂

    Predicted demand peak of 33.8 MW collides with peak tariff. Discharge 4.5 MWh from BESS-1 to cap demand at 31 MW.

    ● Risk lowSLA impact: none
  • Raise cold-aisle setpoint Hall A from 22°C → 24°C
    OPT-198 · cooling
    +$1,620/d
    3,600 kWh · 1,124 kg CO₂

    Inlet thermal margin of 5.3°C across all racks. ASHRAE A1 recommended envelope still respected.

    ● Risk lowSLA impact: none
  • Shift 3 flexible training jobs to 02:00–05:00
    OPT-195 · workload
    +$3,240/d
    11,800 kWh · 4,560 kg CO₂

    GPU jobs J-441, J-447, J-452 marked flexible. Off-peak energy 38% cheaper, carbon intensity 41% lower.

    ● Risk mediumSLA impact: low

Active Alarms

Site FRA-1 · last 24h

TimeSeverityAssetMessageIDStatus
10:24:18 CriticalCRAH-3BSupply temp 24.8°C above setpointA-1042
10:18:02 WarningUPS-2Battery autonomy below 8 minA-1041
10:14:47 CriticalTransformer T-1Winding temp 92°C — approaching trip thresholdA-1040
10:11:55 WarningHall-B Row 7Inlet temp hotspot detected (29.4°C)A-1039ACK
10:05:22 WarningGPU-Cluster-APower draw spike 4.1 MW (limit 3.9 MW)A-1038
09:58:31 InfoBESS-1Discharge schedule armed for 17:00A-1037ACK
09:50:12 WarningCRAC-1AFilter ΔP elevated — service recommendedA-1036
09:42:10 CriticalPDU-11Phase imbalance > 12%A-1035
09:35:47 InfoSolar ArrayPV output curtailed by 220 kW (grid limit)A-1034ACK
09:28:19 WarningSwitchgear SG-2Breaker BR-12 cycle count threshold reachedA-1033